VAC: At 2x10-6; On turbo pumps until end of week. Gate Valves may open early next week. HWS: Team is working on alignment(s). ITMX: Need to run TFs after HEPI is unlocked. Cheryl : In the LVEA taking pictures of HAM2/3. Robert: Looking at the Swiss cheese baffle and noise hunting. Apollo : At End-X working on HVAC controls Patrick : Moving FMC channels for End-Y HVAC controls.