TITLE: 05/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Cheryl not able to make it so Nutsinee, Patrick and myself will cover. Here is a log of the morning from ~7am -10am PDT.
LOG:
- 14:00 PSL Work: Measuring NPRO, check water circuit, take PSL down (Peter K)
- 14:15: Sitewide maintenance at EY, MY, & MX (Chris S)
- 14:23 LVEA work (Bubba)
- 14:30 PSL Plumbing work (Jeff B)
- 15:00 Robert in LVEA
- 15:24: Toilet truck on site
- 15:35 Hartman Table work (Aidan & TJ)
- 15:39 Cintas for mats
- 15:40 End Station Cleaning (Christina/Karen)
- 15:43 CP4 liquid Nitrogen fill (Norco)
- 16:28 CP6 liquid Nitrogen fill (Norco)
- 16:30 Inventory checks (Betsy, Christina)
- 16:43 Leak checking IP6, for starters (Chandra/VAC)