Reports until 10:48, Tuesday 16 May 2017
LHO VE
chandra.romel@LIGO.ORG - posted 10:48, Tuesday 16 May 2017 (36205)
rate of rise in pressure test on x/y beam tube manifold

[John, Chandra]

Valved out IP5 and IP6 from y & x beam manifolds at 10:37 am local time. With no pumping on these volumes, we will trend the rate of rise in pressure over some time today. This will give some indication of whether we have a leak or if IP6 is going bad.