[John, Chandra]
More investigation on leak hunt of x-beam manifold. Here's what we're trying now:
In regard to GV5 not showing as hard closed on the medm screen. I looked at the Beckhoff code. It appears that I am just not seeing a change in signal (from 0 to 1) for the closed limit switch. Both the code and documentation agree that this should be LY terminal 2 channel 4. On April 8 2015 Kyle reported that GV5 hard closed (https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=17748). I see this in the minute trends (attached). This is the most recent time I can find GV5 being hard closed from the alogs. On April 26 2016 LY was upgraded to Beckhoff (https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=26803). I guess we should check the wiring into the Beckhoff chassis?
From minute trends, the last time that GV5 hard closed is on March 14 2016. https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=26065