From 1 PM to 4 PM local time. Good catch report: I told Corey it was alright for him to open the high bay rollup door into the LVEA to push a pallet into the LVEA. Later I remembered that the LVEA was in laser hazard and therefore he should not do this. I managed to run over and stop him before he opened the door. 20:22 UTC Corey taking forklift to highbay to drop off pallet. 20:30 UTC Filiberto to end stations to check documentation. 20:40 UTC Karen driving car to VPW 20:42 UTC Corey opening high bay outside rollup door, driving forklift into highbay, dropping off pallet Aidan and TJ to HAM4, work on HWS table ~ 20:59 UTC Let a truck related to Norco through gate. Could not understand driver after three attempts. Gerardo changing IP6 from dualvac to gamma controller 21:22 UTC Filiberto back from end stations 22:13 UTC Betsy to LVEA to store equipment 22:17 UTC Jenne, Vaishali and Jeff to LVEA to talk to Aidan 22:25 UTC Jenne and Vaishali working on MC table 22:25 UTC Jeff K. taking transfer functions of ITMX, turning on sensor correction for ITMX Jenne and Vaishali out of LVEA 23:13 UTC Aidan and TJ done in LVEA, TJ returning to get something 23:19 UTC TJ back