LHO VE (CDS)
filiberto.clara@LIGO.ORG - posted 16:54, Wednesday 17 May 2017 (36250)
Troubleshooting of GV5 readbacks

FRS 8142
alog 36213

Vacuum group reported GV5 MEDM status did not change once GV5 was hard closed. Issue was traced to a cabling error inside the Vacuum Controls Chassis for LY. The wiring document E1500365 needs to be updated to reflect new change. Readback status of GV5 now shows as being hard closed.

F. Clara, G. Moreno