Displaying report 1-1 of 1.
Reports until 10:16, Thursday 18 May 2017
LHO General
patrick.thomas@LIGO.ORG - posted 10:16, Thursday 18 May 2017 (36257)
Ops Morning Shift Summary
15:00 - 17:15 UTC

15:08 UTC Robert to LVEA to make load acoustical injections.
15:10 UTC Someone unplugged the power supply for the FMCS controller in the control room yesterday around 2:30 PM. Bubba plugged it back in. LVEA temperatures were uncontrolled.
15:33 UTC King soft water through gate to check reverse osmosis
15:45 UTC Robert turned off acoustical injections
15:38 UTC Gerardo to LVEA to move aux carts to GV1 and GV2
15:58 UTC Rush from NOVA film crew through gate
16:04 UTC Christina to mid X
16:09 UTC Karen driving to VPW
16:11 UTC Peter to LVEA to measure green light on one of the tables near HAM1
16:12 UTC Bob, part of video crew, through gate
16:17 UTC Aidan to LVEA to work by HAM4 on HWS table
16:36 UTC Peter done
16:41 UTC TJ to join Aidan in LVEA
Nova film crew setting up in control room
16:58 UTC Karen back
17:02 UTC Christina leaving mid X
17:05 UTC Betsy and Nutsinee to LVEA
Displaying report 1-1 of 1.