Work Permit Summary for 2017 May 16 Maintenance Day
Work Permit Date Description alog/status
6641 5/19/2017 11:34 Sunday evening, May 21st, give personal tour to one or two friends * Walk on Mezzanine in LVEA  
6640 5/18/2017 10:33 Opening GV 1,2 isolating vertex from x & y beam manifolds. The manifold turbos are ON and open to beam tubes. IP 5,6 are valved out. Pumped out gate annuli on both valves. This will allow access to oplevs/pcal camera to help with ITMx alignment and/or imaging. It could also speed up pump down time.  
6639 5/17/2017 10:33 Update and restart the Beckhoff PLC code on h0vacmr to match the IP6 controller change from a dualvac to a gamma. Due to the difference in the signals for the controllers, some EPICS channels will be lost and others added. Minute trend files may be renamed. Requires a DAC restart. Will update autoBurt.req file and MEDM screens. Will coordinate with the vacuum group. 36259, 36266
6638 5/17/2017 9:45 Trouble shoot a script that may have crashed the nds1 server. Run an instrumented copy of the operator alog summary script w/ a new nds2 client to see what caused problems. This should be done when users are not in the middle of large measurements in case we impact h1nds1 again.  
       
Past WPs      
6622 5/8/2017 7:15 Install Air Trap/Bleed (ECR #E1700096) in PSL Crystal Chiller return line. Will need the PSL to be down during the installation. 36223