Displaying report 1-1 of 1.
Reports until 11:12, Monday 22 May 2017
LHO VE
kyle.ryan@LIGO.ORG - posted 11:12, Monday 22 May 2017 - last comment - 04:55, Tuesday 23 May 2017(36310)
Valved-in Vertex RGA to Vertex+YBM+XBM combined vacuum volumes
Kyle 

(Tasks part of WP #6644)

~1015 hrs local -> I valved-in the Vertex RGA to the combined vacuum volumes of the Vertex+YBM+XBM while these volumes were being pumped by their respective turbo pumps.  PT120's response is attached (1 hour of second data).  "From my head" 10-9 torr/10-5 L = 10-4 torr/L of gas accumulated in the unpumped ~5L RGA volume in 14 days?  So, no significant air leaks in the RGA joints.

~1045 hrs. local -> I energized the Vertex RGA filament (note: I am confused with the Pfeiffer software's naming of my connect/scan session with the included phrase "Airdemo..".  The other versions of this software don't do this and I makes me question as to whether I am actually connected to the Vertex RGA (h0rgacs) or am I connected to their "Simulator" or virtual RGA in this connect/scan session?  
Non-image files attached to this report
Comments related to this report
kyle.ryan@LIGO.ORG - 04:55, Tuesday 23 May 2017 (36339)
Correction to this obvious typo error: 

(10-9 Torr)(10+5 L) = 10-4 Torr*L of accumulated gas.
Displaying report 1-1 of 1.