TITLE: 05/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Busy maintenance day. There were a large amount of card reader alarms today, please make sure that you are using your card and informing the operator of your work.
LOG:
- 15:03 Peter to LVEA to check for PSL water leaks
- 15:10 Peter out, leak found
- 15:29 Corey to MY for inventory
- 15:46 Cintas in at the gate
- 15:49 Coca-Cola at the gate
- 16:01 Christina to EX
- 16:03 Jeff B to LVEA to fix leak
- 16:25 Kyle taking forklift to MX
- 16:27 Fil and Gerardo to EY to start WP6646
- 16:41 Norco truck at gate, going to EY (71)
- 16:45? Daniel in LVEA at some point
- 16:56 Daniel out
- 17:04 Jeff B and Peter out
- 17:12 Travis to EX for PCal measurement
- 17:26 Jeff B back to LVEA to check on leak
- 17:37 Kiwamu to LVEA at IOT2 to replace RFPD
- 17:42 Norco at the gate headed to MY (74)
- 17:47 Jeff B out
- 17:48 Karen back from EY, heading into the LVEA
- 18:20 Travis back, Kyle back
- 18:28 Gerardo and Fil back
- 18:39 Paradise water at gate
- 18:47 Marc to MY
- 19:04 Marc back from MY
- 19:08 Karen out
- 19:10 Jeff B and Peter to LVEA for leak
- 19:21 Jeff B and Peter out
- 19:41 Corey back
- 19:57 Fil to EX for WP 6646
- 20:26 Kiwamu and Daniel to LVEA working on IMC
- 20:36 Kyle to LVEA for WP6653
- 20:42 Travis back
- 20:52 Hugh to EY after stopping at a mid station
- 20:54 Richard to LVEA
- 22:06 Bubba to EX mech room
- 15:10 Gerardo to EY to continue BRS work
- 22:16 Kiwamu and Daniel out