H1 PSL (PSL)
peter.king@LIGO.ORG - posted 08:28, Wednesday 24 May 2017 (36365)
Work on PSL air bleed
The laser was shutdown to accommodate fixing the leak in the air bleed circuit
(WP 6654).

    Upon restoration the flow rate to head 3 didn't quite come back to where it
was, and is a tad lower.  We will be watching this over the next few hours.  Nothing
appeared to be in the flow sensor body or hindering the turbine.



JeffB / Peter