TITLE: 05/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Patrick
SHIFT SUMMARY:
LOG:
- The morning was wrought with IMC woes that were remedied by a late arrival of commissioners with tales of the night before.
- There was some re-aligning of arms but no full initial alignment
- There were some lock-losses trying to get locked
- FSS oscillations inhibiting re-lock of IMC - have to constantly drop Fast Gain and then reset it to 9dB
- Kiwamu did some tunings on Soft Loops
- Jenne did some re-calibration of the rotation stage
- There was a tour group of Kindergartners in before noon
- Currently, locking is going well up to NLN without SRM_ASC_HIGH_POWER