TITLE: 05/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR:
SHIFT SUMMARY:
LOG:
13:50 Chris S moved forklift from corner station to mid-X
14:30 Chris S traveled to EY tom remove & discard absorbant pads in fan#2 room. This was due to the Glycol leak noted in aLog from Monday. about 10 mins.
16:45 Nutsinee out to HWS table. Doing fine adjustment of Hartman Y
17:10 Travis to MX for 3IFO work
19:00 Travis back from MX
19:07 Jim and Jeff runningn LF measurements opn all 3 corner station BSCs. Jeff has changed the blends for these in a way that can't be seen in ISI config.
20:00 Fil is at EX
20:17 Sheila is heading into the PSL to perform alignemt of main beam.
20:18 Pep out to EX to make measurements
20:26 Jason and Peter are going to join the PSL enclosure party
20:36 Fil back from EX
20:40 Pep arrived at EX
20:40 Travis back out to MX. Will be craning but not over beam tube.
20:50 Nutsinee goinginto LVEA (TCS cabinet)
22:04 Jason and Sheila out of the PSL for Gabrieles talk
21:22 Pep back from EX
22:10 Kyle into LVEA
22:20 Kyle out of LVEA