TITLE: 05/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering INCOMING OPERATOR: None SHIFT SUMMARY: Sheila, Kiwamu, Jeff K. and Vaishali working on recovery. Made it to 26 W. LOG: 15:18 UTC Jim running low frequency measurements on end Y ISIs. 15:44 UTC Jason to LVEA to look for a crate lid by the H2 PSL enclosure. 15:53 UTC Jason done. 16:35 UTC Jim done measurements and reverting configuration back for locking. 16:39 UTC Kiwamu starting locking attempts. 16:59 UTC Travis driving car to receiving to load material. 16:59 UTC Christina to mid X. 17:24 UTC Aidan working on HWS computer through remote login. 17:42 UTC Dave restarting h1hwsmsr. 18:15 UTC Amber leading school tour through CR. 18:21 UTC Nutsinee to LVEA TCS cabinet. 18:53 UTC Nutsinee out of LVEA. 19:49 UTC Starting initial alignment. 19:54 UTC Dave restarting nds1. 20:02 UTC Dave restarting nds0. 20:21 UTC Initial alignment done. 20:49 UTC Gerardo to end X. 21:08 UTC Kyle to mid Y to retrieve cable. 21:14 UTC Gerardo back. 21:22 UTC Kyle back. 21:51 UTC Travis to LVEA to retrieve tools. 21:59 UTC Travis back. 22:17 UTC Jeff K. taking Nick on tour through LVEA. 22:43 UTC fw0 crashed. 22:46 UTC Jeff K. and Nick back 23:13 UTC fw0 crashed. 23:24 UTC fw0 crashed. 00:22 UTC Starting initial alignment. 01:02 UTC Initial alignment done.