Reports until 22:01, Friday 26 May 2017
LHO General
patrick.thomas@LIGO.ORG - posted 22:01, Friday 26 May 2017 (36463)
Ops Day Shift Summary
TITLE: 05/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Sheila, Kiwamu, Jeff K. and Vaishali working on recovery. Made it to 26 W.
LOG:

15:18 UTC Jim running low frequency measurements on end Y ISIs.
15:44 UTC Jason to LVEA to look for a crate lid by the H2 PSL enclosure.
15:53 UTC Jason done.
16:35 UTC Jim done measurements and reverting configuration back for locking.
16:39 UTC Kiwamu starting locking attempts.
16:59 UTC Travis driving car to receiving to load material.
16:59 UTC Christina to mid X.
17:24 UTC Aidan working on HWS computer through remote login.
17:42 UTC Dave restarting h1hwsmsr.
18:15 UTC Amber leading school tour through CR.
18:21 UTC Nutsinee to LVEA TCS cabinet.
18:53 UTC Nutsinee out of LVEA.
19:49 UTC Starting initial alignment.
19:54 UTC Dave restarting nds1.
20:02 UTC Dave restarting nds0.
20:21 UTC Initial alignment done.
20:49 UTC Gerardo to end X.
21:08 UTC Kyle to mid Y to retrieve cable.
21:14 UTC Gerardo back.
21:22 UTC Kyle back.
21:51 UTC Travis to LVEA to retrieve tools.
21:59 UTC Travis back.
22:17 UTC Jeff K. taking Nick on tour through LVEA.
22:43 UTC fw0 crashed.
22:46 UTC Jeff K. and Nick back
23:13 UTC fw0 crashed.
23:24 UTC fw0 crashed.
00:22 UTC Starting initial alignment.
01:02 UTC Initial alignment done.