Reports until 16:18, Tuesday 30 May 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:18, Tuesday 30 May 2017 (36534)
Ops Eve Shift Transition
TITLE: 05/30 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ed
CURRENT ENVIRONMENT:
    Wind: 20mph Gusts, 17mph 5min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.08 μm/s 
QUICK SUMMARY:

Jenne and Vaishali working on locking ALS on X arm.