TITLE: 05/30 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC STATE of H1: Planned Engineering INCOMING OPERATOR: None SHIFT SUMMARY: LOG: Sheila, Jenne, Jeff K. and Vaishali working on relocking. Ran into possible changes in IMC/CARM loop UGF and the green power output from the end X ALS laser. 23:29 UTC Kyle and Chandra to mid Y ~23:43 UTC Jenne, Vaishali and I adjusted the fiber polarization in the MSR 01:42 UTC Sheila and Jeff to LVEA to measure CARM open loop gain 01:46 UTC Chandra and Kyle back 01:56 UTC Sheila and Jeff back 02:39 UTC Jeff to LVEA to measure IMC loop 02:51 UTC Gave Aidan remote access to take HWS measurement Sheila to LVEA to measure IMC loop