Reports until 16:16, Wednesday 31 May 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:16, Wednesday 31 May 2017 (36575)
Ops Eve Shift Transition
TITLE: 05/31 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ed
CURRENT ENVIRONMENT:
    Wind: 11mph Gusts, 9mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.07 μm/s 
QUICK SUMMARY:

Jenne, Kiwamu, Vaishali, Jeff K, relocking.