TITLE: 05/31 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC STATE of H1: Planned Engineering INCOMING OPERATOR: None LOG: 23:21 UTC Dave offloading minute trends onto h1fw1 23:39 UTC Jenne using PZTs to coalign green onto IR at DC_READOUT 23:45 UTC Jenne done 00:19 UTC Starting initial alignment 00:46 UTC ALS X green falling off in initial alignment. Adjusting PR3 helped bring it back and increased the COMM beatnote. Moving BS to improve AS AIR flashes also helped. 01:15 UTC Initial alignment done Could not lock past DRMI 02:17 UTC Commissioners have left 02:17 UTC Kyle to mid Y 02:34 UTC Kyle back 02:59 UTC Kyle leaving for the night Leaving the IFO at DOWN.