TITLE: 06/01 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
LOG:
15:15 Jim running TFs on HAMs
15:19 Fil to EX for continued cable terminating - SC = off
16:00 Fill back
16:13 Corey going to check the chiller
16:15 Betsy in and out of the optics lab all day
16:26 Chandra headed to MY
16:32 Peter into optics lab- testing Prometheus.
16:50 Bubba back from Mids
17:00 Locking attempts begin
19:30 02 weekly meeting
20:51 Jason, Kiwamu and Peter to EX to investigate ALS laser mode-hopping.
22:50 EX group back.