Reports until 16:11, Thursday 01 June 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:11, Thursday 01 June 2017 (36597)
Ops Eve Shift Transition
TITLE: 06/01 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ed
CURRENT ENVIRONMENT:
    Wind: 24mph Gusts, 17mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.08 μm/s 
QUICK SUMMARY:

Kiwamu and Jason working on ALS.