Reports until 15:57, Friday 02 June 2017
H1 General
edmond.merilh@LIGO.ORG - posted 15:57, Friday 02 June 2017 (36608)
Shift Summary - Day

TITLE: 06/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: TJ
SHIFT SUMMARY:
LOG:

15:00 Sheila to EY to investigate ALSY PLL.

15:15 sensor correction turned of at EY

15:46 Jim doing TFs on HAM5

16:00 Sheila back

16:05 SC turned back on at EY

16:11 Granted Aiden remote access

16:14 Richard transitioning LVEA to LASER SAFE

16:31 SC back OFF on EY - Kiwamu heading back out

16:54 Betsy in LVEA to look through TCS cabinets

16:57 Ken into LVEA to look for a ladder

17:07 Ken out

17:10 Richard and Kiwamu restarting ISC EY computers

17:21 Betsy out. Heading to the MX in 15 minutes.

17:38 Richard back from EY

17:58 Bubba into the LVEA

18:38 Kiwamu back

18:44 Gerardo going into LVEA

18:54 Gerardo out

19:18 Fil going to EY to switch out a common mode servo chassis for ALS

20:02 Fil back

20:46 Fil goin back to end station. Newly installed chassis not responding

20:46 Peter into the optics lab

22:00 Crew back at EY working on ALS

22:30 6.9mag EQ in Alaska 30um/s