Reports until 08:11, Friday 02 June 2017
H1 AOS
edmond.merilh@LIGO.ORG - posted 08:11, Friday 02 June 2017 (36609)
Shift Transition - Day

TITLE: 06/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR:
CURRENT ENVIRONMENT:
    Wind: 2mph Gusts, 0mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.08 μm/s
QUICK SUMMARY:

H1 remains in a state of disrepair. Sheila is down at EY investigating ALS.