Reports until 08:18, Thursday 08 June 2017
LHO General
corey.gray@LIGO.ORG - posted 08:18, Thursday 08 June 2017 - last comment - 00:19, Friday 09 June 2017(36723)
Transition To DAY

TITLE: 06/08 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
    Wind: 14mph Gusts, 9mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.13 μm/s
QUICK SUMMARY:

We currently do not have the GWI.stat or our DMT view showing the H1/L1 BNS ranges (Cheryl has emailed local CDS staff); we can see that we've been at NOMINAL LOW NOISE for just under 6hrs.  Don't have a range to report, but the DARM spectrum on the front wall looks close to the reference. 

At some point this morning we would like to do Sweeps of the LVEA & End Stations

Comments related to this report
patrick.thomas@LIGO.ORG - 00:19, Friday 09 June 2017 (36750)
I was not the outgoing operator.