TITLE: 06/08 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ed
SHIFT SUMMARY:
Main push in the morning was to get our Nominal Low Noise H1 back into OBSERVING. H1 is now back in O2. Had one lockloss toward the end of the shift which was recovered fairly quickly. Had a bit of wind earlier in the day (& we rode through that).
LOG:
- 16:28-17:24 EX & EY Sweep (Jeff)
- 16:45 Peter out of Optics Lab
- 17:04 Military helicopter flyby at EY
- 17:00 -17:26 LVEA Sweep (Corey)
- 18:40 OBSERVING
- 20:40 TJ in Cleaning Room to get Cleaning Wipes
- 21:59 MY IP9 power supply swap (Chandra
- 22:16-23:01: Lockloss: not sure of reason, has been windy all day.
- At NLN had e-17 SDF diffs for ISC & ALS channels, so ACCEPTED them.
- Ed noticed a glitch on the CDS Overview while I was getting ready to go to OBSERVING (several frontends had red & some related to timing....Dave reminded us this is a known glitch!). :)