TITLE: 06/09 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 66Mpc
INCOMING OPERATOR: None
SHIFT SUMMARY:
Had issues locking after a lockloss in the morning. Then discovered issues with ALS during INITIAL ALIGNMENT (see Jenne's alog).
LOG:
- 15:10 Betsy drove to VPW
- 15:30 LOCKLOSS
- ALS powers are at around 0.90. Had to FIND IR by hand.
- Dropped out a few times: (1)in between PRMI & DRMI, (2)while in DHARD WFS step
- 16:29: INITIAL ALIGNMENT
- 17:10 - ?: PEM Injection set-up work in LVEA (Robert)
- 19:04: Back to NLN!
- 21:19-21:15: First Round of PEM Injections (Pep & Robert)
- 21:19-23:13: OBSERVING
- Rode through a couple of EQs
- 23:13: 2nd round of PEM injections begin (Pep & Robert)
- 23:23: Gerardo made VAC gain change.