Reports until 08:14, Saturday 10 June 2017
H1 General
travis.sadecki@LIGO.ORG - posted 08:14, Saturday 10 June 2017 (36771)
Ops Day Shift Transition

TITLE: 06/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 61Mpc
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
    Wind: 6mph Gusts, 4mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.14 μm/s
QUICK SUMMARY:  No issues were handed off and H1 has been locked for 20+ hours.  Bubba is leaving the site as of 15:14 UTC and reports that the door lock issue has been resolved.