TITLE: 06/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
Wind: 12mph Gusts, 9mph 5min avg
Primary useism: 0.10 μm/s
Secondary useism: 0.14 μm/s
QUICK SUMMARY: Just made it back to NLN and Observing. No issues with relocking after Patrick's IA. Had to accept a few SDF diffs, 2 for ISCEX and ISCEY that were 10^-17, so didn't bother taking a screenshot. The H1SYSECATX1PLC2 diff I accepted is attached for reference.