H1 IOO (CDS)
filiberto.clara@LIGO.ORG - posted 13:44, Tuesday 13 June 2017 (36856)
Installation of PSL GigE cameras

WP 7011

Cabling for the installation of two PSL GigE cameras were pulled and terminated. Cables are connected to a patch panel on SUS-R1, ports 11 & 12. Connection to the network switch in the CER still needs to be made. Cables were not pulled into the PSL enclosure.