Ops Shift Transition: 06/14/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) - UTC (PT)
State of H1: IFO locked at NLN with 29.7W and 63.3Mpc of range
Intent Bit: Observing
Weather: Wind is Calm; Skies are clear; Temps in the mid-70s
Primary 0.03 – 0.1Hz: At 0.009um/s
Secondary 0.1 – 0.3Hz: At 0.05um/s
Quick Summary: IFO after recovering from two large EQ in Central America the IFO has been in observing for the past 2.5 hours. The Yaw A2L is a bit elevated. Pitch is OK. Will run the repair script if the opportunity arises. All else appears OK.
Outgoing Operator: Patrick