Reports until 16:19, Wednesday 14 June 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:19, Wednesday 14 June 2017 (36896)
Ops Day Shift Summary
Ops Shift Log: 06/14/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN 29.7W, 61.5Mpc of range  
Intent Bit: Observing
Support: N/A
Incoming Operator: TJ

Shift Summary: Dropped out of Observing for commissioning work. Took advantage of this to run the A2L repair script. Both Pitch & Yaw are back to below the reference.

In Observing for past 5 hours. No issues or problems to report.    

Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Patrick
15:55 (08:55) Drop into Commissioning – Jeff K. running calibration
15:55 (08:55) Run A2L Repair script
16:10 (09:10) Peter – Going into Optics Lab looking for parts
16:12 (09:12) Gerardo – Going to Mid-Y to check scroll pump
16:31 (09:31) Christina – Going to End-X to drop off supplies
16:45 (09:45) Christina – Going to Mid-X for cleaning
17:09 (10:09) Peter – Out of the Optics Lab
17:40 (10:40) Caterers on site for NSF Review
17:59 (10:59) Robert – Going into the LVEA – will be around the input arm
18:00 (11:00) Investigating high dust counts in Optics Lab – Found Rick S. & Betsy in lab
18:34 (11:34) Robert – Out of LVEA – Light and WiFi are off
18:34 (11:34) Back into Observing after clearing a few SDFs
18:45 (11:45) Koji – Going into the Optics Lab
18:50 (11:50) Rick & Betsy – Out of the Optics Lab
20:15 (13:15) Kyle – Going to Mid-Y
20:22 (13:22) Peter – Going into Optics Lab
20:45 (13:45) Kyle – Back from Mid-Y
20:47 (13:47) Travis & Betsy – Going to Mid-X
23:00 (16:00) Turn over to TJ