Summary of the DQ Shift from Monday 12th June to Wednesday 14th June (Link for full report):
- Total 64.7% duty cycle (88.8%, 51,4%, 54.1%) for three days; BNS inspiral range around 60-65Mpc.
- There are lock losses due to earthquakes in Guatemala and Greece for all days.
- Several suspension overflows from the OMC alignment during three days, which is associated with the range drops.
- PyCBC live produces high new-SNR triggers due to "BLIP", "Scattering", "Koi-fish" glitches.
- On the1st and the 3rd days, the round 1 winner of hveto produced a microphone glitch at end station of Y-arm that seems to be caused by an air compressor but unclear.
- On the 3rd day, there are many glitches with huge SNRs (above 2000)