Reports until 00:03, Friday 16 June 2017
LHO General
thomas.shaffer@LIGO.ORG - posted 00:03, Friday 16 June 2017 (36922)
Ops Eve Shift Summary

TITLE: 06/16 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Started the shift with some commissioning work and a few lockloss. Then after the commissioners left I got it locked, but the lock looked glitchy and not great. It broke a bit ago and I started an initial alignment hoping that may be the cure. Good luck Ed.

The EX tempurature may have dropped a bit as well. I attached a plot of a bunch of different sensors that Robert suggested I watch. The FMC channels dont show much changing, but the PEM tempurature channel does show a drop today. These are 4 day thrends.
LOG:

Images attached to this report