Reports until 07:24, Friday 16 June 2017
LHO FMCS
bubba.gateley@LIGO.ORG - posted 07:24, Friday 16 June 2017 (36932)
Minor changes to FMCS at EX
I have changed a couple of the tuning loops at EX to try and slow the heater reaction time, specifically, the P&I loops on the heater control from 11.5 to 10.5 and the supply air temperature reset up from 60degrees to 62degrees F.