Ops Shift Log: 06/15/2017, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN 28.9W, 57.9Mpc
Intent Bit: Observing
Support: N/A
Incoming Operator: Jim
Shift Summary: Ran A2L check script at the shift start. Both Pitch and Yaw are below the reference line. There were problems last night of low range, unruly RF45 noise, and gusty winds. The RF45 noise continues this morning.
Lost lock at beginning of the shift. Relocked without too much trouble. Robert has the IFO for commissioning work until 16:30 (09:30).
Back to Observing. Commissioning work finished for now.
Sheila turned off sensor correction at End-Y because the BRS was damping due to high winds.
After the BRS damping settled down changed the ISI_CONFIG state back to WINDY.
Activity Log: Time - UTC (PT)
14:57 (07:57) Take over from Ed
15:10 (08:10) Lockloss – Unknown
15:25 (08:25) Robert & Bubba – Running the fire pump for noise testing
15:43 (08:43) Relocked at NLN – Robert commissioning
16:08 (09:08) Robert – Running the fire pump for noise testing
16:26 (09:26) Intent bit to Observing
16:55 (09:55) Koji – Going into the Optics Lab
17:45 (10:45) Change ISI_CONFIG state to WINDY_NO_BRS
20:34 (13:34) Jeff K. – Changing ISI_CONFIG state back to WINDY
23:00 (16:00) Turn over to Jim