O2 Update:
- ER 11: graceDB crashed over the weekend, back now
- commissioning on H1, beam walking on ITM, and noise is better (lower)
- commissioning for beam walking will continued
Tuesday Maintenance plans:
- EX beckoff, replace hardware
- Apollo in CER for scaffolding
- line investigation at EX and EY
- fix power supply for EX ISC beckoff module
- GV14 annulus ion pump replacement (MX) - on hold for now
- CBRS (replacement) - IX and IY (LVEA vertex)
- cable pulling into PSL for GigE camera - in PSL
- evaluation of swiss cheese baffle
- RF coupling measurement
- 120MHz measure modulation depth - in PSL, need DRMI or higher
- readback for BRS ion pumps - added to DAC, EY, EX - DAC restart
- 9MHZ RF AM - replace beckhoff module
- oplev - replace EX (glitching) - recenter EX, IX, SR3 - power adjustments EY, IY
- HPO diode test - requires H1 be unlocked (around 30 minutes) - will start first thing in the morning
- inspect HEPI fluid reservoirs - should not effect anything, but might trip HEPI - will do first thing in the morning