Ops Shift Transition: 06/19/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: IFO is relocking
Intent Bit: Commissioning
Weather: Wind is a light Breeze; Skies are partly cloudy; Temps in the mid 90s
Primary 0.03 – 0.1Hz: At
Secondary 0.1 – 0.3Hz: At
Quick Summary: Relocking – Commissioning
Outgoing Operator: Cheryl