Displaying report 1-1 of 1.
Reports until 00:11, Tuesday 20 June 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:11, Tuesday 20 June 2017 (37005)
Ops Evening Shift Summary
Ops Shift Log: 06/19/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) Time - UTC (PT)
State of H1: Locked at NLN 29.2W, 48.2Mpc
Intent Bit: Observing
Support: N/A
Incoming Operator: Gorey

Shift Summary: After the IFO relocked, ran A2L check script. Pitch is a bit rung up, since we are in commissioning mode decided to run the repair script to make things better.  

LLO called about a GRB alert. LHO did not receive notice from Verbal Alarms. In one hour hold.

Around 06:00 (23:00) the ASC Pitch Control and Error signals started to ring up. Could find no apparent reason. Sheila’s aLOG #35371 talks about this and OpLev damping. ITMX and ETMX OpLevs are off center. However, OpLev damping appears to be off on ITMY and ETMY. Range is suffering.

 

Activity Log: Time - UTC (PT)
23:00 (16:00) Tack over from Cheryl
23:25 (16:25) Kyle – Going to Mid-Y
23:44 (16:44) Kyle – Back from Mid-Y
00:16 (17:16) Relocked at NLN
00:31 (17:31) Intention bit set to Observing
00:51 (17:51) Damp PI Mode-27 by switching Phase sign
05:05 (22:05) GRB Alert – In one hour hold
06:05 (23:05) End GRB one hour hold
07:00 (00:00) Turn over to Corey

 

Displaying report 1-1 of 1.