Restarted all nuc computers in control room per Carlos's request. 15:09 UTC Karen to end Y (cleaning) 15:15 UTC Hugh and Chris to mechanical room 15:17 UTC Took ISC_LOCK to DOWN for Jason to start PSL FAMIS tasks 15:19 UTC Jim and Krishna to LVEA (compact BRS) 15:22 UTC Hugh HEPI CS 15:23 UTC Dick and John to LVEA 15:32 UTC Christina leaving end X 15:33 UTC Sudarshan to end X (PCAL) 15:35 UTC Filiberto to CER, slow controls chassis 6 15:39 UTC Kyle to LVEA to retrieve vacuum pump 15:40 UTC Jason done 15:46 UTC Carlos to CER to restart work station 15:49 UTC Hugh to end stations (HEPI) 15:51 UTC Pep, Ed and Paul to end Y (ESD power supply) 15:57 UTC Gerardo to end Y (pull cable) 15:58 UTC Karen leaving end Y 16:00 UTC Peter transitioning LVEA to laser safe 16:05 UTC Jason to end X to swap and recenter optical lever laser 16:10 UTC Richard to CS roof to re-terminate weather station temperature sensor 16:11 UTC Carlos back 16:11 UTC Karen to LVEA (cleaning) 16:11 UTC Peter done transitioning LVEA to laser safe. Peter to optics lab. 16:18 UTC Alex Urban restarting GDS calibration pipeline 16:19 UTC Alex done 16:27 UTC Rick to end X to work with Sudarshan 16:28 UTC Richard back 16:30 UTC Krishna back 16:37 UTC Krishna back to LVEA 16:40 UTC Dave making CALCS model change 16:44 UTC Hugh back from end stations, to LVEA to move roaming seismometer 16:47 UTC Keita taking SURF students on tour through LVEA 16:55 UTC Pep, Ed and Paul back 16:57 UTC Sheila and Cheryl to PSL enclosure to pull in cables for GigE camera 17:00 UTC Filiberto done 17:05 UTC Hugh back, Ed to end Y, LN2 delivery through gate 17:14 UTC Jenne, Joe, and Paul to beer garden to glue accelerometers on floor 17:17 UTC Kiwamu aligning PRM and SRM 17:21 UTC Paradise water delivery 17:29 UTC Jason back, to LVEA to recenter ITMX, SR3 and power adjust ITMY 17:32 UTC Filiberto to end Y to help Gerardo 17:35 UTC Kiwamu to LVEA to check cabling around ISC rack 3 (near HAM6) 17:39 UTC Hanford fire through gate 17:41 UTC Changed power to 30 W for Cheryl 17:42 UTC Ace toilet service through gate 17:43 UTC Changed power back to 2 W 17:46 UTC Sudarshan out of end X 17:55 UTC Chandra done checking AIP 18:01 UTC Ed back (was back earlier) 18:05 UTC Keita done with tour, Cheryl back 18:06 UTC Jason done in LVEA, going to end Y 18:11 UTC Chandra WP 7054 18:15 UTC Jenne, Joe and Paul back