Reports until 12:04, Tuesday 20 June 2017
H1 IOO (IOO, PSL)
Link
cheryl.vorvick@LIGO.ORG -
posted 12:04, Tuesday 20 June 2017
(37022)
GigE cameras installed on PSL, plugged in, but no beams on them
cables pulled in to the PSL
IO_GigE1 placed near it's final location, 18.5 inches from lens IO_AB_L2
IO_GigE2 placed at the edge of the table in such a way that it's cable is coming onto the table in the right location
both IO beams exceed the power density for the GigEs at 30W, so will require additional attenuation before cameras are installed
IO_GigE1 is S/N: 21238186
IO_GigE2 is S/N: 21238190
IO_GigE1 beam position: ~1.5mm diameter beam, current beam power at 30W is 1mW
IO_GigE2 beam position: ~1.5mm diameter beam, current beam power at 30W is 20.8mW
- Sheila, Cheryl
Images attached to this report