Reports until 16:21, Tuesday 20 June 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:21, Tuesday 20 June 2017 (37038)
Ops Evening Shift Transition
Ops Shift Transition: 06/20/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: IFO is locked at SRM_ASC_HIGH_POWER  
Intent Bit: Commissioning
Weather: Wind is 3 to 20mph; Skies are mostly clear; Temps in the lower 90s  
Primary 0.03 – 0.1Hz: X & Y Axis at 0.1um/s, Z Axis is at 0.02um/s 
Secondary 0.1 – 0.3Hz: At 0.07um/s   
Quick Summary: IFO is locked as commissioning work continues  
Outgoing Operator: Cheryl