Ops Shift Log: 06/20/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) Time - UTC (PT)
State of H1: Locked at NLN, 28.8W, 66.3Mpc
Intent Bit: Observing
Support: Sheila
Incoming Operator: Corey
 
Shift Summary: Commissioning work continues. Back to NLN. Ran A2L check DTT; Pitch is OK, Yaw is elevated. Run the A2L repair script.
LLO is down due to the Tropical Storm in the Gulf. They are canceling the remaining night shifts. The day shift will reevaluate the situation in the morning.
LLO Ops has secured the site until tomorrow AM.
Relocked at NLN, clear SDFs, Damp PI Mode-28, and back to Observing.
Kind of a rough night for lock stretch. After commissioning ended had strong and gusty winds for the final third of the shift. Many gusts into the upper 30s and mid 40s. Winds are abating somewhat, but still rather gusty. Seismic activity as started to come down as well. Range has picked up a bit.    
 
Activity Log: Time - UTC (PT)
23:00 (16:00) Take over from Cheryl
23:10 (16:10) Relocked at SRM_ASC_HIGH_POWER
23:28 (16:28) Lockloss – Commissioning
23:56 (16:56) Kiwamu & Daniel – Going into the CER
00:00 (17:00) Kiwamu & Daniel – Back from CER
00:11 (17:11) Relocked at NLN
00:20 (17:20) Sheila & Jeff – Turn off ITM-Y OpLev laser
00:30 (17:30) Sweep LVEA
01:22 (18:22) Sheila – Turn back on the IMT-Y OpLev laser
01:52 (18:52) Damp PI Mode-26
01:55 (18:55) Lockloss – Unknown
02:27 (19:27) Relocked at NLN
02:34 (19:34) Damp PI Mode-26 by Phase sign flip
02:50 (19:50) Sheila – Going into the LVEA to unplug the fiber from the ITM-Y OpLev laser
02:56 (19:56) Sheila – Out of the LVEA
03:05 (20:05) LLO – IFO is in DOWN, Ops has secured the site until tomorrow AM
03:30 (20:30) Lockloss – Commissioning
04:35 (21:35) Relocked at NLN
04:46 (21:46) Damp PI Mode-28 – Phase sign flip and increase
04:57 (21:57) Back to Observing
05:51 (22:51) Lockloss – Unknown
06:23 (23:23) Relocked at NLN – Back to Observing
07:00 (00:00) Turn over to Corey
 