Displaying report 1-1 of 1.
Reports until 09:26, Tuesday 20 June 2017
H1 CAL (CAL, DetChar)
alexander.urban@LIGO.ORG - posted 09:26, Tuesday 20 June 2017 - last comment - 13:28, Wednesday 21 June 2017(37017)
GDS calibration pipeline restarted with gstlal-calibration-1.1.7

The primary and redundant h(t) pipelines were restarted at GPS second 1182010698. This pipeline restart is not accompanied by any filter changes, but does pick up gstlal-calibration-1.1.7. For more information on this version of the code, please see its redmine page.

For more information about the filters currently being run, please see the following aLOG entries:
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=36864
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=36842

Comments related to this report
gregory.mendell@LIGO.ORG - 15:38, Tuesday 20 June 2017 (37034)

The corrected filter file needed for LHO Work Permit Number 7047 had already been staged on the DMT on June 14. Thus, this restart of the calibration code picked up the corrected filter file, and this completes LHO Work Permit Number 7047.

alexander.urban@LIGO.ORG - 13:28, Wednesday 21 June 2017 (37067)

Correction to this alog: the pipeline restart does not affect the version of gstlal-calibration running, since version 1.1.7 was already running at Hanford. However it does pick up corrected filters, but the file pointing to those filters had the same name so no command line change was needed. I apologize for the confusion.

Displaying report 1-1 of 1.