Reports until 16:25, Wednesday 21 June 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:25, Wednesday 21 June 2017 (37071)
Ops Evening Shift Transition
Ops Shift Transition: 06/21/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1:  Locked at NLN, 28.7W, 61.3Mpc 
Intent Bit: Commissioning
Weather: Wind is upper teens to mid 20s with gusts over 30mph. Skies are clear, Temps in the mid 80s   
Primary 0.03 – 0.1Hz: X & Y Axis at 0.1um/s, Z Axis at 0.01um/s
Secondary 0.1 – 0.3Hz: At 0.2um/s
Quick Summary: IFO is locked and commissioning work underway
Outgoing Operator: Travis