Ops Shift Log: 06/21/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) Time - UTC (PT)
State of H1: Locked with 28.8W and 64.8Mpc
Intent Bit: Observing
Support: Sheila
Incoming Operator: Corey
Shift Summary: Ran A2L check script, Pitch and Yaw are both below the reference.
LLO will be down and unmanned for the rest of the evening.
After commissioning work finished for the evening set the intent bit to Observing.
Wind driven microseism is a bit elevated. No other problems or issues effecting the IFO were noted.
Activity Log: Time - UTC (PT)
23:00 (16:00) Take over from Travis
02:34 (19:34) Set intent bit to Observing
07:00 (00:00) Turn over to Corey