TITLE: 06/22 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: EARTHQUAKE
INCOMING OPERATOR: Travis
SHIFT SUMMARY:
Fairly standard shift until a big Guatamalan EQ took H1 down for going on 2.5hrs. EQ band recently low enough to start locking up H1 again.
Saw a pair of porcupines.
LOG:
- 8:36 TCSy Chiller Flow Low Alarms begin & Topped Off (see alog)
- 10:38 -11:38 GRB (Swift) Stand Down Time.
- 12:39: EQ Lockloss
- 13:46 Starting to align ALS. ALSy was in La La Land no matter what ETM tweaks I tried. I Cleared History for End Y Overview and tried to reduce error signals, but I didn't get very far. Ultimately, I started an Initial Alignment over for ALSy. In retrospect, I should have just waited a little longer for the EQ to die down a little.
- Currently locking on steps after DRMI as I hand off to Travis