Ops Day Summary
Aug. 3 OPS:

Start of the day: 
ISI tripped on ETMY - HEPI tripped on ITMY - Vincent looking into it, Bram emailed

Work going on:
craning arm to install on HAM3
Filiberto to EY to pull network cable
Karen to LVEA to clean
Patrick working in the NYN room
Patrick to EX to install dust monitor
Eric to HAM2 to install hardware on actuators
Kyle to EY - retrieving equipment from VEA
Alex to EY - inventory in TMS lab
Michael R. to EY TMS lab to verify tagged out lasers
Doug to HAM3 optics table to measure some threaded hole diameters
Karen and Chris to EY to clean
HAM3 has an ARM attached to it