Aug. 3 OPS: Start of the day: ISI tripped on ETMY - HEPI tripped on ITMY - Vincent looking into it, Bram emailed Work going on: craning arm to install on HAM3 Filiberto to EY to pull network cable Karen to LVEA to clean Patrick working in the NYN room Patrick to EX to install dust monitor Eric to HAM2 to install hardware on actuators Kyle to EY - retrieving equipment from VEA Alex to EY - inventory in TMS lab Michael R. to EY TMS lab to verify tagged out lasers Doug to HAM3 optics table to measure some threaded hole diameters Karen and Chris to EY to clean HAM3 has an ARM attached to it