Ops Shift Transition: 06/30/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: Unlocked - Earthquake
Intent Bit: Commissioning
Weather: Wind is up to 12mph, Skies are clear and temps are in the low 90s
Primary 0.03 – 0.1Hz: 2.0um/s (Earthquake)
Secondary 0.1 – 0.3Hz: 0.4um/s
Quick Summary: IFO unlocked due to EQs in Ecuador
Outgoing Operator: Cheryl