Displaying report 1-1 of 1.
Reports until 16:22, Saturday 01 July 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:22, Saturday 01 July 2017 (37272)
Ops Evening Shift Transition
Ops Shift Transition: 07/01/2017, Evening Shift 23:00 – 07:00 (16:00 - 00:00) - UTC (PT)
State of H1: Locked at NLN, 27.5W, 65.4Mpc of range
Intent Bit: Observing
Weather: Wind is blowing between 4 & 12mph, skies are clear, with mid-90s temperatures  
Primary 0.03 – 0.1Hz: X and Y axis at 0.02um/s, Z axis at 0.009um/s
Secondary 0.1 – 0.3Hz: 0.04um/s
Quick Summary: Things look good right now. The IFO has been in Observing for the past 2.0 hours. A2L Pitch and Yaw are both below the reference. The RF45 noise that plagued Patrick during the Day shift is currently behaving.   
Outgoing Operator: Patrick
Displaying report 1-1 of 1.