Reports until 16:00, Monday 03 July 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:00, Monday 03 July 2017 (37298)
Ops Day Shift Summary
TITLE: 07/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 59Mpc
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY: The smoke from the fire seems to be dissipating. There have been numerous loud low frequency glitches up to around 100 Hz for the last couple of hours. They do not appear correlated with RF noise.
LOG:

~18:15 UTC Mike and Marilyn to observation deck to check on fire.
18:21 UTC Mike and Marilyn back. Report some smoldering areas.
18:24 UTC Mike and Marilyn leaving site
19:24 UTC LLO down. Took out of observing to run a2l.
19:43 UTC Back to observing.